Resize the map
Product & Service
Country
Year
Loading

VOITH Hydro had a refurbishment project in Turkmenistan, HPP ???, for their testing purpose, HPP requested to have relay test system to test the delivered cabinets with integrated relays from various suppliers Facility / Plant / Site VOITH Hydro Client / Partner direct End-Client HPP ?? Country AUT Year 2017 Status Ongoing Voltage Level 110 kV

Calibration of Insulating Oil Test Systems for their transformer oil testing procedures in the laboratory Facility / Plant / Site Elektroprijenos d.d. Client / Partner direct End-Client Elektroprijenos, Sarajevo Country BIH Year 2017 Status Completed Voltage Level 400 kV, 220kV, 110 kV Supplier BAUR Products & S

For their testing purpose, Siemens maintenance department requested to cable testing and diagnostic testing set to have a fast, effective and reliable testing on their supplied HV / MV cable to thier customer Facility / Plant / Site Siemens Client / Partner direct End-Client Siemens, Graz Country AUT Year 2017 Status Ongoing Voltage Level 110 kV Supplier

For their testing purpose, contractor Intercomplex requested to have relay test system in order to have a fast, effective and reliable testing on their supplied HV / MV cabinets with integrated relays from various suppliers Facility / Plant / Site Intercomplex Client / Partner PSS Bulgaria End-Client Intercomplex Country BG Year 2017 Status Completed Voltage Level 110 kV

In 2014 we had started to negotiate with HOPS to integrate regular testing purposes by installing Cicuit Breakers from vaious suppliers. By end of 2014 we performed on site at s/s Zerjavinec with our local partner a demonstration of KoCoS Test and Measurment system - ACTAS, in combination with PROMET and EPOS, to perform a total circuit breaker test. The 420kV circuit breaker, with following technical specification - Three pole HV CB, single pole operated, two interrupter units (SF6) with capacitor, hydraulic drive, rated control voltage 220 V DC. CB is assembled in coupler field (main-aux bus 400 kV) – had been tested successfully, according customer requirem

For their testing purpose, building contractor Theodorou Takis requested to have resistance and inductive test system to test inductive loads on distribution transformers and put them into operation Facility / Plant / Site THEODOROU TAKIS Client / Partner DRY Techniki SA End-Client THEODOROU TAKIS, Thessaloniki Country GR Year 2017 Status Completed Voltage Level 110 kV

For their continous monitoring system, contractor ENERCON requested in their supplied cabinets from SPRECHER Automation to have an independet DAU (digital data aquistion unit) to measure and record the complete energy flow, DSI, harmonics from all wind generators in the distribution substation to the grid Facility / Plant / Site Windpark, Sweden Client / Partner SPRECHER Automation End-Client ENERCON Country AUT Year 2017 Status

Facility / Plant / Site CEDIS Client / Partner Elektromontaza End-Client CEDIS, Pdogorica Country MNE Year 2017 Status Completed Voltage Level up to 110 kV Supplier BAUR Products & Systems TransCable / Cable Fault Location Van Industries Electric Distribution

For their testing purpose, AURUBIS Plant requested to have relay test system in order to have a fast, effective and reliable testing on their supplied HV / MV cabinets with integrated relays from various suppliers Facility / Plant / Site AURUBIS Client / Partner PSS Bulgaria End-Client AURUBIS Country BG Year 2017 Status Completed Voltage Level 110 kV

For their testing purpose, maintenance and service activities, transmission grid ADMIE requested to have resistance and inductive test system to test inductive loads on power transformers and put them into operation Facility / Plant / Site ADMIE Client / Partner MAB International End-Client ADMIE Country GR Year 2015 Status Completed Voltage Level 400 kV, 220kV, 110 kV

For their testing purpose, maintenance and service activities, contractor GE Grid requested to have resistance and motor and coil test system to own test circuit breakers and disconnectors on-site Facility / Plant / Site ALSTOM Client / Partner direct End-Client ALSTOM / GE Country AUT Year 2015 Status Completed Voltage Level 400 kV, 220kV, 110 kV Supplier

For a ALSTOM project at a 1000 MW TPP Coal Fired Power Plant, TANJUNG BIN, JOHOR, in MALAYSIA, customer requested from contractor Kolektor to supply a digital fault recorder system, according technical specifications, in order measure and recorded appearing faults at generator outgoing bay and 400 / 220 / 110kV s/s Facility / Plant / Site Kolektor Client / Partner METRIKA End-Client Kolektor Country SI Year 2013 Status Complete

Customer requested to have a reliable test and measurement unit to measure Power Quality fluctuation on the distribution grid Facility / Plant / Site PSS Bulgaria Client / Partner direct End-Client PSS Country BG Year 2013 Status Completed Voltage Level 110 kV Supplier KoCoS Products & Systems

For quality inspection purposes on catalytic converters, customer RTA requested to have a test bench measurement system to test and verify each catalytic converter on their tolerances. The OMCAT catalytic converter measuring systems provide a fast and  efficient means of carrying out complex geometrical measurements  on exhaust catalytic converters and of determining the gap bulk  density (GBD). Facility / Plant / Site Roth Technik Austria (RTA) Client / Partner direct End-Client RTA Country AUT

For a project at a Mall in Sofia, customer requested from contractor PSS Bulgaria an independet DAU (digital data aquistion unit) to measure continous power quality monitoring and record appearing faults in their distribution network Facility / Plant / Site PSS Bulgaria Client / Partner direct End-Client PSS Country BG Year 2013 Status Completed Voltage Level 110

Koncar-KET had a refurbishment project in Kenia, HPP Kamburu; HPP requested to have a relay test system to test the delivered cabinets with integrated relays from various suppliers Facility / Plant / Site Koncar-KET Client / Partner Koncar-KET End-Client HPP Kamburu Country HR Year 2013 Status Completed Voltage Level 110 / 11 kV Supplier

Distribution utiltiy CEZ requested to have a reliable test and measurement unit to measure Power Quality fluctuation on the distribution grid 110kV Facility / Plant / Site CEZ Distribuce Client / Partner direct End-Client CEZ Country CZ Year 2012 Status Completed Voltage Level 110 kV Supplier KoCoS Products & Sy

For maintenance and service activities, customer requested to have a reliable High-Precision Ohm Meter to measure resistance values on their supplied HV / MV  circuit breakers to their customers Facility / Plant / Site ABB, Austria Client / Partner direct End-Client ABB, Vienna Country AUT Year 2012 Status Completed Voltage Level 400

For a contractor project, company CMC-C, requested to supply a reliable 3 phase relay test system in order to be able to test integrated relays from various suppliers on thier delivered HV / MV cabinets Facility / Plant / Site CMC-C Client / Partner PSS Bulgaria End-Client CMC-C Country BG Year 2012 Status Completed Voltage Level 400 kV, 220kV, 110 kV

For a contractor project, company EQOS Energie, requested a reliable 3 phase relay test system in order to be able to test integrated relays from various suppliers on thier delivered HV / MV cabinets Facility / Plant / Site EQOS Energie Client / Partner direct End-Client EQOS Energie Country AUT Year 2012 Status Completed Voltage Level 400 kV, 220kV, 110 kV

For their continous monitoring system, utility EVN with corporation technical university Vienna TU Wien, requested to have in their cabinets from italian manufacturer to have an independet DAU (digital data aquistion unit) to measure and record the complete energy flow, DSI, harmonics from all wind generators in the distribution substation to the grid Facility / Plant / Site Windpark, Austria Client / Partner direct End-Client TU Wien Country AUT Year

For their continous monitoring system, utility EVN with corporation technical university Vienna TU Wien, requested to have in their cabinets from italian manufacturer to have an independet DAU (digital data aquistion unit) to measure and record the complete energy flow, DSI, harmonics from all wind generators in the distribution substation to the grid Facility / Plant / Site Windpark, Austria Client / Partner direct End-Client EVN Country AUT Year

for their own testing purposes, contractor ARIES had requested a relay test system to test various relays on site and perform maintenance and service activities within their customers Facility / Plant / Site ARIES Client / Partner direct End-Client ARIES Country HR Year 2016 Status Completed Voltage Level 400 kV, 220kV, 110 kV Supplier

Customer requested to have a reliable test and measurement unit to measure Power Quality fluctuation on the distribution grid Facility / Plant / Site Elektrodistribucija, BiH Client / Partner EXCELLENT d.o.o. End-Client Elektrodistribucija, Division Sarajevo Country BIH Year 2016 Status Completed Voltage Level 110 kV Supplier KoCoS

For maintenance and service activities, customer requested to have a reliable High-Precision Ohm Meter to measure resistance values on the generator connections in HPPs Facility / Plant / Site TIWAG Wasserkraft Client / Partner direct End-Client TIWAG Wasserkraft Country AUT Year 2016 Status Completed Voltage Level 110 kV Supplier KoCo